SIMCO can tailor solutions to meet client specific needs and requirements when dealing with hazardous materials containment, severe industrial environments, and any other particular requirement associated to industrial buildings or processes. SIMCO’s contribution to industrial projects can be as early as the preliminary design phase or at any time during the service life when a durability assessment and service life extension is required.

Structural assessment & characterization of the buildings to preserve historical elements during the functional repurposing of the Molson District.

Restoration and modernization of a historic industrial concrete plant

Design of an innovative floating plate system maximises durability for a refinery’s delayed coker unit.

SIMCO engineered and designed of a phased rehabilitation solution to restore the sulfur pit and deliver a 20+ year service life.

Refinery Coke Pit Wall Protection
SIMCO engineered a custom precast wall system and protective repairs to address deterioration and impact damage for a U.S. refinery coke pit.

Rehabiliation of a Sulfur Pit Liner & Roof
An integrated engineering and rehabilitation solution restored a severely deteriorated sulfur pit and extended the service life of its critical components.

SIMCO developed a phased repair solution to extend the service life of 11 concrete silos while minimizing disruption to operations.

SIMCO assessed FCC Unit deterioration and developed a targeted repair strategy ahead of a scheduled turnaround.

SIMCO engineered an innovative hydraulic jacking solution to realign coke drums at a West Coast refinery, minimizing operational disruption.

SIMCO assessed the deteriorated concrete silo and engineered a rehabilitation solution to extend its service life.

SIMCO assessed an aging sulfur pit and engineered a comprehensive retrofit to extend its service life and improve long-term reliability.

SIMCO assessed an aging sulfur pit and engineered a comprehensive retrofit to extend its service life and improve long-term reliability.

SIMCO assessed a vibrating chlorinator structure, identified the root cause, and engineered a solution to improve structural stability.

SIMCO conducted comprehensive internal inspections of two sulfur pits at a power plant to assess deterioration and define a repair strategy.